Simulation Readiness™
Determine whether the simulator is ready for use.
Simulation Readiness Index™
92%Ready
Overall assessment of the simulator to determine if it's ready for its intended purpose.
Building Simulator Readiness — 7 Health Domains
- 1Engineering Connectivity98%
- 2Digital Baseline98%
- 3Change Management88%
- 4Control & Performance92%
- 5Lifecycle & Maintainability91%
- 6Knowledge & Standardization88%
- 7Simulation Readiness92%
Simulator trust is earned through every health domain working together.
Purpose-Specific Readiness Scores
96%
Operator Training Readiness
Ready
93%
Engineering Study Readiness
Ready
91%
Startup Validation Readiness
Ready
89%
Optimization Readiness
Caution
94%
MOC Validation Readiness
Ready
Top Blocking Issues
- Boiler Controller CTRL-101 not synchronizedChange Management
- 2 controller firmware versions mismatchedLifecycle
- Alarm help coverage below target in Area 300Knowledge
- Historian connection intermittent warningCommunications
Business Outcomes
- Deploy training with confidenceOperators learn on a simulator you can trust.
- Validate engineering changesTest strategies and changes before you implement.
- Reduce startup riskStart up faster and safer with validated scenarios.
- Support management decisionsMake better decisions with a trusted digital twin.
- Increase operator confidenceOperators trust the simulator and the training it provides.
- Improve engineering productivityLess rework and faster problem resolution.
- Reduce simulator downtimePrevent issues before they impact availability.
- Maximize Digital Twin ROIGet more value from your simulation investment.
Confidence begins with readiness.